PUBLIC CONTRACT INTELLIGENCE · SOURCE-CITED
GE Power Conversions Limited public-sector contracts
A documented starting point for researching UK public procurement. This page records 1 recent public award record found in the reviewed source window; it does not claim that the supplier is seeking work or that a new opportunity exists.
Recent award timeline
10 November 2026 · ocds-h6vhtk-07b81b
Removal of PMM Motors
Buyer: ORE Catapult
Published value: £324,238
Award: 1 · Source status: pending — pending, not evidence of a completed purchase
Linked lots: 1 · Suppliers on this award: 1
Published classifications: None retained in this parsed record.
Research GE Power Conversions Limited in UK public procurement
The retained evidence covers 1 distinct procurement record and 1 named buyer: ORE Catapult. The latest retained publication is “Removal of PMM Motors”, published 10 November 2026.
Use the buyer and contract title together when researching comparable requirements. Open each official release to check the tender description, award status and lot allocation before treating this supplier as a comparable provider. This is a bounded source sample, not a complete contract portfolio.
What to check for this supplier
- For “Removal of PMM Motors”, establish which deliverables ORE Catapult described and verify the award status and scope.
- Check whether the named supplier received a direct contract or a framework position; appointment alone does not establish guaranteed revenue.
- Compare the published requirements with your own capability profile before pursuing a similar opportunity.
Published scope and award details
The following evidence belongs to “Removal of PMM Motors”, published by ORE Catapult. It is a historical source snapshot reviewed on 10 November 2026, not a live availability check.
- Procurement procedure
- Direct award
- Status on the retained award
- pending — a source status, not proof of an open tender
- Award identifier
- 1
- Release identifier
- 106459-2026
- Period recorded on this award
- 2026-11-21T00:00:00+00:00 to 2027-03-31T23:59:59+01:00
- Suppliers named on this award
- 1
Notice scope excerpt
The purpose of this direct award is to appoint GE to support the safe removal of permanent magnets from the motor unit in the 15MW facility as part of the decommissioning on the test rig.
The excerpt describes the procurement as a whole. It does not establish this supplier’s individual deliverables or lot allocation. This excerpt may be truncated. Source wording about applications or deadlines is historical and must not be read as an invitation to bid now.
Procurement route and comparison checks
The retained procedure is “Direct award”. Read the buyer’s justification and any framework or exemption reference; this award is not an invitation to compete and does not establish a future competitive tender.
- Buyer match: confirm that requirements from ORE Catapult are comparable to the buyer, location and service scale you intend to target.
- Delivery scope: use the excerpt above to identify deliverables, exclusions and technical constraints. Verify each against the complete documents before claiming a capability match.
- Timing: check the award-specific period above against later contract notices. A missing date is unknown; it is not a renewal signal.
This profile is an independent research aid from Team J8VEST. It is not an endorsement by, or an affiliation with, the named supplier or buyer. The sample is not the supplier’s complete contract portfolio.
Questions for a bid or market team
- Which published requirements and lots led to GE Power Conversions Limited being named?
- What evidence would a supplier need for comparable UK public procurement?
- Do later notices change the term, value, scope or status of these awards?
Answer these questions from the complete procurement pack and later notices. Store the source URL, publication date and exact field behind every conclusion. A supplier name in an award does not prove present capacity, customer satisfaction, future demand or revenue attributable to that supplier.
How to interpret this record
The timeline is evidence of published procurement history, not a lead score. Values can describe a lot, ceiling, estimate or whole contract and must not automatically be treated as annual supplier revenue. Framework appointment does not guarantee call-off work.
Check the original tender, lot structure, duration, modifications and termination notices. Compare several awards before calling a pattern repeatable, and label every inference separately from source facts.
Related supplier workflow
J8VEST · BID SIGNAL & FIT
Move from public notices to a focused first review.
J8VEST screens recent UK Find a Tender notice data against one supplier capability profile and returns source-cited signals for human review.
Review the subscription ↗Initial excerpt-based screening only. No guarantee of complete coverage, signal volume, time savings or contract wins.